WA Department of Education Modular Programs: How Builders Get Ready for the Next Round

Written 28 October 2026. For WA builders who tender school work, the Department of Education runs modular kindy, pre-primary and toilet block programs each school year, and the 2026 mid-year round was awarded on 9 September 2026. The problem is timing. A round opens, the tender window is short, and a builder without a module supplier lined up spends that window chasing prices instead of pricing the job well.

What the rounds tell builders

These programs are not one-off. They come back each school year, which means a builder can plan for them the way it plans for any repeat client. The winners of the mid-year round are now on site or close to it. The builders who missed out have a clear window to fix whatever slowed them down before the next round.

In our experience the slow points are the same each time. Module scope is unclear. The structural engineer gets the module details late. Transport and crane access to a working school site is not checked until after award. Each of these can be sorted now, while there is no tender clock running.

Why modular fits school sites

A school cannot stop for a building program. Modules are built in the offsite factory while the site works go in, so the time with trades on school grounds is shorter. Most crane lifts can be booked for school holidays or weekends. Noise, dust and traffic sit mostly in the factory, not next to a classroom.

Kindy and pre-primary rooms also repeat. The same room plan, wet area and services layout can be built several times, which suits a factory process that checks each module the same way. Our page on the WA school building pipeline sets out the wider program for builders.

What EcoPrestige supplies

EcoPrestige supplies engineered structural steel volumetric modules, built and inspected in the factory, to the builder who holds the head contract. We are not the builder. You carry the site, the footings, the services connections and the client relationship. We supply the modules with the documentation your engineer and building surveyor need, under a supply-only model with a documentation pack.

  • Steel-framed classroom, kindy and amenity modules sized for road transport
  • Module structural documentation for your engineer to review
  • Factory inspection records for each module
  • Installation sequence and lift points for your crane planning
  • A supply price quoted for your site

What does not fit

Not every school job suits modules. Very tight sites with no crane setdown, buildings that must tie into an older structure at many points, and one-off spaces with long clear spans are often better built on site. We will say so early rather than force a module answer onto the wrong brief.

The approval path in WA

School buildings are typically Class 9b, confirmed by your building surveyor. In WA, building surveying is done by a registered building surveying contractor. Building design is not a registered category in WA, and building engineers must be registered from 1 July 2027. EcoPrestige coordinates the module design with your consultants; permit drawings are issued by the registered or licensed practitioner the state requires. Always confirm with your building surveyor or certifier. Our building permit guide for modular buildings covers inspections and occupancy.

The programme

Factory and site run in parallel. While your team pours footings and runs services to the pad, the modules are fabricated and inspected in the factory. Delivery is timed to the site being ready, then the crane day sets the modules, and your trades finish the connections, fit-off and handover. Time on site is shorter because the two streams overlap.

What to send us before the next round

  • 1. The school, the suburb or town, and the room types you expect to price
  • 2. Any standard plans or briefs from past rounds you hold
  • 3. Site access notes: gate widths, overhead lines, crane setdown
  • 4. Your engineer and building surveyor contacts
  • 5. Your tender timetable, so we can hold factory time

If you are newer to this kind of work, our Perth modular construction page explains how we work with WA builders, and transportable buildings in WA covers trucking and site rules.

Frequently asked questions

When does the WA Department of Education run modular rounds?
The Department of Education runs modular kindy, pre-primary and toilet block programs each school year. The 2026 mid-year round was awarded on 9 September 2026.

Does EcoPrestige tender directly to the Department?
No. EcoPrestige supplies modules to the builder who tenders and holds the head contract. The builder carries the site and the client relationship.

What NCC class are school classroom modules?
School buildings are typically Class 9b, confirmed by your building surveyor.

Who signs off school modules in WA?
A registered building surveying contractor handles building surveying in WA. Confirm the full list of signatories with your building surveyor or certifier.

How do we get a supply price before the round opens?
Send the room types, the site and any past plans. We return a supply price quoted for your site so it is ready when the tender window opens.

Line up your module supply before the next WA school round

Send the site, the use and any drawings to prebuilt@ecoprestige.com.au or download our technical brochures.

Planning a commercial modular project?

Talk to our team about supply and early contractor involvement.