Written 28 October 2026. This update is for developers, builders and operators deciding where modular supply makes sense over the next year. Policy gets the headlines, but demand is what fills a factory slot. Here is what the published figures say about demand, sector by sector and state by state, with the source named for each.
Housing: the national gap
Housing Accord completions were 308,000 after 7 of 20 quarters, the National Housing Supply and Affordability Council reported on 21 August 2026. The Council forecasts the 1.2 million target being reached in the December quarter of 2030. Housing Australia Future Fund Round 3 opened on 30 January 2026 for the remaining 21,350 of 40,000 social and affordable homes due by 2029. Our HAFF Round 3 page covers what applicants need.
Student accommodation and build to rent
The Property Council reported a student accommodation pipeline of 47,233 beds on 1 June 2026, with more than 14,100 under construction. The build-to-rent pipeline is 51,000 apartments worth $40.1bn, BDO reported, with 24,855 in Victoria, 17,465 in New South Wales and 6,301 in Queensland. Most build-to-rent is high-rise, so modular fits there as components and bathroom pods, not whole buildings. See modular student accommodation and modular build to rent.
Aged care and childcare
The Weekly Source reports aged care needs about 10,600 new places a year, that 802 were added in 2024-25, and that about 4,000 new beds are forecast for 2026-27. Aged care is typically Class 9c, confirmed by your building surveyor. For childcare, The Sector reported on 8 October 2026 that the Building Early Education Fund is $1bn, including $500m for new centres and expansions in childcare deserts, with first grants to Lalor, Trevallyn, Merredin and Bathurst.
Workforce and tourism
In WA, the Pilbara Development Commission counted 80,432 workforce beds in December 2025, projected to reach 91,435 by 2028. In Queensland, QGSO reported a Bowen Basin resource workforce of about 47,530 in June 2025, with 26,330 living outside the council area where they work. On tourism, Australasian Leisure Management reported on 24 September 2026 that G’day Group plans more than $200m across 12 Discovery Parks in regional Queensland before the 2032 Games. See holiday park cabins in Queensland.
Where modular fits in this market
The strongest fit is low-rise, repeat buildings on regional or suburban sites: cabins, workforce rooms, key worker homes, childcare rooms and student blocks of a few storeys. Each of these repeats a plan many times, which suits a factory that inspects every module the same way.
What EcoPrestige supplies
EcoPrestige supplies engineered structural steel volumetric modules, built and inspected in the factory, to builders, developers and operators. We are not the builder. The builder holds the head contract and the site. You receive a supply price quoted for your site, not a generic rate.
What does not fit
High-rise build to rent as whole modules, inner-city sites with no crane room, and buildings with long clear spans are usually better built another way. Modules can still help there as bathroom pods or plant rooms. We will tell you which applies.
The approval path
Approvals depend on the state. Outside Victoria, Queensland and Tasmania, EcoPrestige coordinates the module design with your consultants; permit drawings are issued by the registered or licensed practitioner the state requires. In Queensland, permit drawings are issued under a QBCC licensed building designer. Confirm with your building surveyor or certifier, and see our building permit guide.
The programme and what to send us
Factory and site run in parallel, so time on site is shorter. To check whether your project suits modules, send:
- 1. The sector and the state
- 2. The site address or region
- 3. The number of rooms, beds or dwellings
- 4. Funding or tender deadlines
- 5. Your consultants, if appointed
Frequently asked questions
How far along is the Housing Accord?
Housing Accord completions were 308,000 after 7 of 20 quarters, the National Housing Supply and Affordability Council reported on 21 August 2026.
How large is the student accommodation pipeline?
The Property Council reported 47,233 beds on 1 June 2026, with more than 14,100 under construction.
Does modular suit build to rent?
Most build-to-rent is high-rise, so modular fits as components and bathroom pods rather than whole buildings.
How many workforce beds are in the Pilbara?
The Pilbara Development Commission counted 80,432 beds in December 2025, projected to reach 91,435 by 2028.
Does EcoPrestige publish a standard rate?
No. Every project gets a supply price quoted for your site.
See also mining camp accommodation in WA.
Related: our guide to modular holiday park cabins.
Test your project against this month’s demand
Send the site, the use and any drawings to prebuilt@ecoprestige.com.au or download our technical brochures.