WA builders and developers now share the market with a set of government-backed local manufacturers. On 24 May 2026, as recapped here on 28 October 2026, the WA Government announced a $49m Housing Innovation Fund for 15 local housing manufacturers, plus $48m to support two named local factories. The 2026-27 Budget added a record $4.7bn of extra housing investment. The problem for a builder is working out what the fund changes for its own projects, and where supply will still be short.
What the fund is
- $49m Housing Innovation Fund for 15 local housing manufacturers (WA Government, 24 May 2026).
- $48m to support two named local factories (WA Government, 24 May 2026).
- A record $4.7bn of extra housing investment in the 2026-27 Budget.
The fund backs manufacturing capacity in WA. It is not a grant to builders for individual projects. Builders should read it as a sign that government buyers will expect offsite methods in tenders.
Where demand outruns supply
WA demand is spread far beyond Perth. The Pilbara Development Commission counted 80,432 workforce accommodation beds in December 2025, projected to reach 91,435 by 2028, with many villages at capacity. In the Wheatbelt, 54 two-bedroom modular seniors homes are going across 17 sites (Australian Manufacturing, 17 August 2026). The Department of Education runs modular kindy, pre-primary and toilet block programmes each school year. Funded local factories will not cover all of this. See our Pilbara workforce accommodation channel and WA modular schools pipeline for those streams.
Why modular fits WA
Distance drives cost in WA. Every trade sent to a remote site needs flights or long drives and a bed. Modules arrive with most of the work done, so fewer trades travel and remote camps carry fewer extra workers. The builder’s crew focuses on footings, services and connections.
What EcoPrestige supplies
- Engineered structural steel volumetric modules, built and inspected in an offsite factory.
- Housing, workforce accommodation, office and amenity modules.
- Module design coordinated with your consultants.
- A delivery plan for regional and remote sites.
Our transportable buildings in Western Australia page covers moving modules to regional WA.
What does not fit
We are not a fund recipient, and nothing here is advice on applying. Sites reached only by roads that close seasonally need careful planning. Buildings with large clear spans or heavy plant may suit a site-built frame better.
The approval path in WA
EcoPrestige coordinates the module design with your consultants; permit drawings are issued by the registered or licensed practitioner the state requires. Building design is not a registered category in WA. Building surveying is by a registered building surveying contractor, and building engineers must be registered from 1 July 2027. Homes are typically Class 1a and workforce accommodation is typically Class 1b or 3, confirmed by your building surveyor.
The programme
Factory and site work run in parallel. Modules are built while the builder prepares the pad, footings and services, so time on site is shorter. For remote sites, we set delivery windows around road conditions and crane availability.
What to send us
- 1. The site and its region.
- 2. The use and number of buildings.
- 3. The funding source or tender, if any.
- 4. Drawings or a site plan.
- 5. Road and crane access notes.
For Perth metro work, see our modular construction Perth page.
WA Housing Innovation Fund: questions
What is the WA Housing Innovation Fund?
The WA Government announced on 24 May 2026 a $49m Housing Innovation Fund for 15 local housing manufacturers.
Is EcoPrestige one of the 15 manufacturers?
No. EcoPrestige is a module supplier to builders and developers. We do not claim any part of the fund.
What else did WA announce?
The WA Government also announced $48m to support two named local factories and a record $4.7bn of extra housing investment in the 2026-27 Budget.
Who certifies a building in WA?
Building surveying is by a registered building surveying contractor. Building engineers must be registered from 1 July 2027. Confirm with your building surveyor.
How is a WA supply price given?
Supply price quoted for your site, after we review the location, the building use, the road route and crane access.
See also mining camp accommodation in WA.
Delivering homes or accommodation in WA?
Send the site, the use and any drawings to prebuilt@ecoprestige.com.au or download our technical brochures.