What Will WA’s Registered Building Engineer Rule from 1 July 2027 Mean for Modular?

From 1 July 2027, building engineers in Western Australia must be registered. For modular buildings, that means the engineer who signs the module structure, connections and footings for a WA project will need to hold that registration. Building design is still not a registered category in WA, and a registered building surveying contractor still certifies.

This page is for WA builders, developers, mining and resources operators, and government buyers planning modular buildings in Perth, the Pilbara and the regions. The problem is timing: a project designed in 2026 may reach its permit or construction stage after 1 July 2027, so the engineering sign-off needs planning now.

What changes and what does not

  • Changes. Building engineers must be registered from 1 July 2027.
  • Does not change. Building surveying is by a registered building surveying contractor.
  • Does not change. Building design is not a registered category in WA.

The detail of which engineering work falls under the scheme is set by the WA regulator. Confirm the current position with your building surveyor and engineer.

Why it matters for modular

A modular building has two structural stages: the module in transit and lifting, and the finished building on its footings. Both need engineering. When the factory and the site engineer work separately, it must be clear who signs which part. From 1 July 2027 that person must be registered for WA work.

The volume is large. The Pilbara Development Commission counted 80,432 workforce accommodation beds in December 2025, projected to reach 91,435 by 2028, with many villages at capacity. Rio Tinto has awarded Sodexo the management of more than 19,000 FIFO rooms across 25 Pilbara villages. See our pages on WA mining workforce accommodation and the Pilbara villages.

What EcoPrestige supplies

EcoPrestige supplies engineered structural steel volumetric modules made in the factory and inspected there by the project engineer. We coordinate the module design with your consultants and give your WA engineer the module frame, lifting and connection information. Workforce accommodation is typically Class 1b or 3, offices typically Class 5, confirmed by your building surveyor. The supply price is quoted for your site.

What does not fit

If a project cannot name its WA engineer before production, it should not start production. Remote sites with poor road access may also need smaller modules or a different method.

The approval path in WA

EcoPrestige coordinates the module design with your consultants; permit drawings are issued by the registered or licensed practitioner the state requires. Building surveying is by a registered building surveying contractor, and building engineers must be registered from 1 July 2027. Confirm with your building surveyor or certifier. Our consultant brief sets out what we hand to the structural engineer and surveyor.

The programme

Engineering sign-off and the permit come first. Then the modules are made in the factory while the builder prepares footings and services. Factory and site run in parallel, so time on site is shorter. The WA Department of Education already buys modular kindy, pre-primary and toilet block buildings each school year; see WA modular schools.

How to prepare now

  • Check the likely permit and construction dates against 1 July 2027.
  • Name the WA engineer who will sign the module structure, connections and footings.
  • Ask that engineer whether they hold, or will hold, the new registration.
  • Agree who signs the transit and lifting design and who signs the final building.
  • Keep factory inspection records ready for the engineer and surveyor.

Projects that sort this out early avoid a gap in sign-off later, when the modules are already made.

Related reading

See our pages on modular construction in Perth and transportable buildings in WA.

What to send us

  • 1. The site, building use and expected permit date.
  • 2. Your WA structural engineer, or whether you need one named.
  • 3. Your building surveying contractor.
  • 4. Any drawings or site data.
  • 5. Road access and crane details.

WA building engineer registration: FAQ

When must building engineers be registered in WA?
From 1 July 2027.

Does the rule affect modular buildings?
Yes. The engineer who signs the module structure, connections and footings for a WA project will need the registration from that date.

Is building design a registered category in WA?
No. Building design is not a registered category in WA.

Who certifies a modular building in WA?
A registered building surveying contractor. Confirm with your building surveyor.

Planning a modular building in WA past July 2027?

Send the site, the use and any drawings to prebuilt@ecoprestige.com.au or download our technical brochures.

Planning a commercial modular project?

Talk to our team about supply and early contractor involvement.