What can I build as a granny flat in Geraldton? In most residential zones you can build an ancillary dwelling up to 70 m2 without development approval, if it meets the R-Codes deemed-to-comply rules. That has been the WA Government rule since 10 April 2024. A building permit is still required, and the City of Greater Geraldton can tell you whether the exemption applies to your lot.
This page is for homeowners in Geraldton, Mullewa, Dongara, Northampton, Kalbarri and the farming districts around them. Many want a second home for family, a worker or a tenant. The barrier is not usually planning. It is the distance to trades and the time it takes to get a small build started in a region where builders are stretched.
Granny flat rules in the Mid West
- A floor area of up to 70 m2 for the exemption from development approval.
- No minimum lot size of 350 m2.
- No need to match the main house in style or materials.
- A building permit from the local government in every case.
The City of Greater Geraldton covers Geraldton and Mullewa. Dongara sits in the Shire of Irwin, and Northampton and Kalbarri sit in the Shire of Northampton. Each applies the state rules through its own local planning scheme, and rural lots can carry extra conditions.
Why modular suits the Mid West
A modular granny flat is finished in the factory and arrives on a truck. Your builder prepares the footings and services, a crane sets the modules, and the trades connect power, water and drainage. That cuts the number of days you need trades on a site that may be an hour or more from town.
It also helps with quality control. Fit-out, wet areas and electrical rough-in are done and checked before the modules leave, rather than spread across many site visits in coastal wind and summer heat.
What EcoPrestige supplies
As the manufacturer, EcoPrestige is responsible for every module: built and inspected in an offsite factory to Australian engineering and QA, then delivered to site. You get a small home that is ready for connection, with the paperwork your builder and building surveyor need.
- Structural steel modules engineered for the wind region of your site.
- Kitchen, bathroom, laundry, linings and windows fitted before delivery.
- A bill of quantities for footings, services and site works.
- Supply price quoted for your site once we know the lot and the access.
The design and permit package and how the deposit works are on the Domestic Program page.
What does not fit
- No truck or crane access: a narrow side gate or overhead power lines across the yard can rule modules out, or add cost to move them.
- Wind and coastal exposure: sites close to the coast need a wind rating set for that site, which affects tie-down and footings.
- Bushfire prone land: rural and edge-of-town lots may need a bushfire assessment before the design is final.
- Flood-affected land: lots near rivers and low ground may need raised floors.
- Heritage areas and steep slopes: both add planning steps or footing cost.
If you are still choosing between a transportable, a demountable and a modular home, read modular vs portable vs transportable buildings.
The approval path in WA
We design and draft your home, then coordinate engineering, the energy rating and certification. WA does not register building designers. A registered building surveying contractor signs the certificate of design compliance, and the local government issues the building permit. Building engineers must be registered from 1 July 2027. A granny flat is typically Class 1a, confirmed by your building surveyor. For the inspection stages and final sign-off, see building permits for modular buildings. Confirm each step with your building surveyor or certifier.
The programme
Step 1 of the Domestic Program is feasibility on your site, so you know early if the lot, the access and the services work. Step 2 is design, permits and build by the practitioners WA requires. After the permit, the factory makes the modules while the builder prepares the pad and services in Geraldton or on the farm. Factory and site run in parallel, so time on site is shorter. The builder is your own builder or a local Mid West builder working from our bill of quantities.
What to send us
- 1. The lot address, or the farm lot and road name.
- 2. The use: family, worker or rental, and the bedrooms you need.
- 3. Photos of the access track or gate and the house site.
- 4. Water and wastewater: scheme, tanks, sewer or septic.
- 5. Distance from the coast and any bushfire notice.
- 6. Your builder’s details, if you have one.
For wider WA context, see transportable buildings in Western Australia and modular construction in Perth.
Update, November 2026: WA’s draft R-Codes propose raising the granny flat limit from 70 m2 to 90 m2. The 70 m2 limit applies until the draft is finalised. See what the draft R-Codes propose.
Frequently asked questions
How big can a granny flat be in Geraldton without development approval?
Up to 70 m2, if it meets the R-Codes deemed-to-comply rules, according to the WA Government. Ask the City of Greater Geraldton or your shire to confirm the exemption for your lot. A building permit is still required.
Can I put a granny flat on a farm in the Mid West?
Often yes, but rural zones can carry extra conditions under the local planning scheme. Check with your shire, confirm truck and crane access, and sort out water and wastewater first.
Who signs off a granny flat in WA?
A registered building surveying contractor signs the certificate of design compliance, and your local government issues the building permit.
Rules last checked: 29 October 2026. Confirm with your council and building surveyor or certifier.
Send us your Geraldton or Mid West block
Send the site, the use and any drawings to prebuilt@ecoprestige.com.au or download our technical brochures.