EcoPrestige is a builder-facing modular systems supplier. We do not retail to homeowners and we do not compete with builders on site. Our process is engineered around one outcome: builders receive modular structures that arrive certified, on programme, and ready to install.

This page outlines how that delivery actually works — from engineering through to install support — so builders, developers, architects, and project managers can quickly understand where the risk sits and what we control.

1. Engineering & documentation (Australia)

Every project begins with Australian engineering oversight. Structural design, NCC compliance review, energy and acoustic assessments, and shop-drawing coordination are managed in Australia before manufacturing begins.

  • Australian-engineered structural steel module systems
  • NCC compliance pathway documented up-front (Class 1a / Class 3 / Class 5 / Class 9 as relevant)
  • Evidence of suitability prepared for surveyors before manufacture
  • Shop drawings reconciled against architectural intent and on-site constraints
  • Wind, seismic, BAL and bushfire ratings specified per location

Related: Evidence of suitability for modular buildings.

2. Controlled manufacturing

As the manufacturer, EcoPrestige is responsible for every module: built and inspected in an offsite factory to Australian engineering and QA, then delivered to site. This is not a buy-and-ship arrangement — it is a controlled procurement model.

  • EcoPrestige-defined QA inspection points across the build
  • Material certifications and test reports retained for surveyor evidence
  • Staged photo and video verification through manufacture
  • Optional on-site Australian inspections at agreed milestones
  • Pre-shipment acceptance before modules leave the factory

As the manufacturer, EcoPrestige is responsible for every module: built and inspected in an offsite factory to Australian engineering and QA, then delivered to site.

3. Delivery to Australia & New Zealand

Logistics is handled as part of the supply scope. Modules are packed for transit, shipped, and transported to site, with road transport quoted per project or to a builder-nominated marshalling yard.

  • As the manufacturer, EcoPrestige is responsible for every module: built and inspected in an offsite factory to Australian engineering and QA, then delivered to site.
  • Customs clearance and documentation handled
  • Delivery sequencing aligned to the builder’s programme
  • Crane requirements and site access reviewed pre-delivery

Typical end-to-end programme is 5–7 months from order to delivery for repeat typologies, depending on scope.

4. Install support — not install responsibility

EcoPrestige supplies the modular system. The builder runs site. This separation is deliberate and is what makes the model commercially safe for both sides.

  • Install drawings and connection details provided
  • Site visits and remote support during install milestones
  • Defect rectification managed under the supply warranty
  • Site-specific scope (slab, services tie-in, fitout, certification) remains the builder’s

This scope split is documented and shared up-front so there is no ambiguity at handover.

5. Sectors we deliver into

Why builders work with us

Three things repeat across feedback from the builders, developers, and project managers we deliver to:

  • Documentation discipline — surveyors get what they need without chasing
  • Programme certainty — modules arrive when committed, packaged for install
  • Scope clarity — what we do, and what site does, is defined before contract

We are intentionally not a retail builder. The process above is built for repeat-volume builders who want a controlled supply partner — not a competitor.

Next step

Builders, developers, architects, and PMs comparing modular suppliers can request a builder pack with technical detail, scope split, indicative pricing, and recent project references.

ECI Program fees

Stage 1, feasibility and modular design integration: $4,000 + GST, about 10 business days. Stage 2, detailed design and documentation coordination: $20,000 + GST for projects up to two storeys with module supply under $2 million (ex GST); larger projects are priced on a tiered scale by supply value, confirmed at Stage 1. Design fees are separate from module supply.

Terms, approvals and building laws vary from state to state. We confirm what applies to your site before you commit.