Yes, a modular building can usually be extended later by adding more modules beside it or, if the structure was designed for it, on top of it. It works best when the extension is planned from the start, with footings, structure, services and site access set up for the future modules. An extension is still building work, so it needs its own approval and must meet the code that applies at the time.
This page is for councils, schools, childcare operators, accommodation operators and developers across Australia who need space now but expect to need more later. The usual problem is building the first stage with no allowance for the second, then finding the services are too small or there is nowhere for the crane.
Why modular suits staged growth
Modules are made to a fixed grid. If the first stage is planned on that grid, later modules can line up with it and match the look and specification. Factory and site work run in parallel for each stage, so time on site is shorter and the existing building keeps operating during most of the work. Developers rolling out several stages can read about staged and multi-site modular rollouts.
What to plan for at stage one
Footings and structure
If you may add modules on top later, the frame, connections and footings must be designed for that load now. Adding a level to modules designed for a single storey is usually not practical.
Services
Size the power supply, water, sewer and stormwater for the final building, or leave a clear path to upgrade them. Put capped connection points at the side where the extension will go.
Access and crane position
Keep a truck route and a crane position free for the future modules. A car park or playground built over the only crane pad is a common mistake.
Fire and egress
An extension can change fire separation, exits and travel distances for the whole building. Ask your building surveyor how the planned final size affects stage one, so you do not have to rework it.
What EcoPrestige supplies
EcoPrestige supplies engineered structural steel volumetric modules, built and inspected in an offsite factory. Through early contractor involvement we can set out a module layout for the first stage that allows for a later one, and keep the module drawings so a future stage can match. The ECI service is where this planning happens.
When extending is harder
Extending a modular building that was never designed for it is possible but harder. The original drawings, engineering and records may be missing. The finishes may no longer be made. A change of NCC class, such as turning offices into accommodation, can bring new fire and access requirements across the whole building. If the site has no room or no crane access left, an extension may not be practical at all.
The approval path
The extension needs a building permit or approval, and may need planning approval. The NCC class depends on the use, for example offices typically Class 5, childcare typically Class 9b and homes Class 1a, each confirmed by your building surveyor. EcoPrestige coordinates the module design with your consultants; permit drawings are issued by the registered or licensed practitioner the state requires. In Queensland, permit drawings are issued under a QBCC licensed building designer. In Tasmania, they are issued by a licensed Tasmanian building designer. For homes in Victoria, design, permit documentation and construction are contracted by our sister company DST Project Management and Construction Pty Ltd, registered domestic builder CDB-U 72187. See the building permit guide for modular buildings.
The programme
For a later stage, the factory builds the new modules while the builder prepares footings and services beside the existing building. The disruptive part, the lift and connection, is kept short. Plan it around the times the existing building is least used.
What to send us
- 1. The site address and the existing building, if there is one.
- 2. What the first stage is for and what the final building may be.
- 3. Any existing drawings and records.
- 4. Where you think the extension will go.
- 5. Any planning permit or approval already in place.
Extending a modular building: questions
Can you add more modules to a modular building later?
Usually yes, beside the existing building or on top of it if the structure was designed for the extra load. It works best when the extension was planned at the start.
Can a single storey modular building have a second storey added?
Only if the frame, connections and footings were designed for it. Adding a level to modules designed for a single storey is usually not practical.
Does a modular extension need a building permit?
Yes. An extension is building work and needs its own permit or approval, and it must meet the code that applies when it is built.
What should I plan now for a future modular extension?
Footings and structure for the final size, services sized or upgradeable, capped connection points, a clear crane position and truck route, and fire and egress planned for the final building.
Will the extension match the original building?
It can if the original module drawings and specification are kept and the finishes are still available. Planning both stages together makes matching much easier.
More detail: modular childcare centres in NSW.