Childcare operators, councils and not-for-profit providers planning new centres in childcare deserts face a hard mix: thin local trades, tight grant timelines and a building type with strict rules. EcoPrestige supplies engineered structural steel volumetric modules, built and inspected in an offsite factory, for childcare centres across Australia. A builder delivers the centre and the site. We supply the modules and coordinate them with your consultants.
Why modular fits Building Early Education Fund projects
The Building Early Education Fund includes a dedicated stream for new centres and expansions in childcare deserts. The Sector reported on 8 October 2026 that the first grants went to Lalor in Victoria, Trevallyn in Tasmania, Merredin in Western Australia and Bathurst in New South Wales, with more to come. Several of those places are regional, where finding enough trades for a full site build is slow.
Childcare centres suit modules well. Playrooms, nappy change rooms, cot rooms, staff rooms and kitchens follow repeatable sizes. The structure, linings, wet areas and services rough-in are finished in the factory while the builder prepares the site, footings and outdoor play space. Our 25 questions on modular childcare centres cover layout, compliance and operations in detail.
What EcoPrestige supplies
- Playroom modules sized to your licensed places and age groups.
- Nappy change, children’s toilet and bathroom modules.
- Cot room, kitchen, laundry and staff room modules.
- Office and entry modules for reception and parent sign-in.
- Module engineering, coordinated with your structural engineer.
- Factory inspection records for your building surveyor.
What does not fit
- Outdoor play space, shade and landscaping. These are site works by your builder.
- Multi-storey centres on tight urban sites.
- Large open playrooms with no internal walls, where module joins limit the plan.
- Sites with no crane access or poor truck routes.
The approval path for a childcare centre
A childcare centre is typically Class 9b, confirmed by your building surveyor. That class sets fire safety, exits, accessibility and other requirements that must be built into the module layout from the start.
In NSW, WA, SA, the ACT and the NT, ecoPrestige coordinates the module design with your consultants; permit drawings are issued by the registered or licensed practitioner the state requires. In Victoria, permit drawings are likewise issued by the registered practitioner the state requires, and a registered building surveyor issues the permit. In Queensland, EcoPrestige does not offer design. Permit drawings are issued under a QBCC licensed building designer. In Tasmania, EcoPrestige does not offer design. Permit drawings are issued by a licensed Tasmanian building designer.
Planning approval comes first, and the service also needs approval from the state regulatory authority before it opens. Talk to your regulator early about room sizes and layout. Our page on permits, inspections and occupancy for modular buildings explains how the surveyor inspects work made offsite. Councils running their own centres can also read our guide for regional councils.
The programme: factory and site in parallel
The factory builds and inspects the modules while the builder prepares the site, footings, services and outdoor areas. Modules are delivered by truck, craned into place and connected, then the builder finishes the internal joins, fit-out and landscaping. Time on site is shorter, which helps a grant-funded centre open to families sooner.
What to send us
- 1. The site address and zoning.
- 2. Licensed places and age groups.
- 3. Grant status and any funding deadlines.
- 4. Your builder, planner and building surveyor, if appointed.
- 5. Any concept plans or council advice.
Builders and operators who want the layout tested before they price can use our early contractor involvement service.
Frequently asked questions
What NCC class is a childcare centre?
A childcare centre is typically Class 9b, confirmed by your building surveyor.
Is EcoPrestige the builder of the childcare centre?
No. EcoPrestige supplies the modules. A builder holds the head contract, prepares the site, installs the modules and finishes the centre.
Can a modular centre meet the room requirements for childcare?
Yes, when the module layout is set around your licensed places and age groups from the start. Confirm room sizes with your regulator early.
Who prepares the permit drawings?
It depends on the state. In Queensland they are issued under a QBCC licensed building designer, and in Tasmania by a licensed Tasmanian building designer. Elsewhere, the registered or licensed practitioner the state requires issues them.
How is pricing handled?
Supply price quoted for your site, once we have the address, the licensed places and the access details.
Related: Childcare Deserts and the Early Education Fund: The Operator’s Brief 2026.
Planning a childcare centre under the Building Early Education Fund?
Send the site, the use and any drawings to prebuilt@ecoprestige.com.au or download our technical brochures.