Families moving to Drouin and Warragul, and the builders and council trying to keep up with them, are short of one thing: people on the tools. Baw Baw Shire is growing along the Princes Freeway more quickly than local crews can build, and owners with a block ready often wait a long time for a start date. EcoPrestige supplies structural steel volumetric modules, built and inspected in an offsite factory, so most of the work is done before anything reaches the block.

Why modular fits Baw Baw

The shire’s target under the Plan for Victoria housing targets published by the Victorian Government, Department of Transport and Planning is 25,700 net new homes by 2051. That is a lot of houses for two main towns and a ring of smaller ones such as Trafalgar, Yarragon and Neerim South. It also means more demand for kindergartens, health rooms and offices in the same years.

The trade gap is not just a Baw Baw problem. At a Parliament of Victoria Environment and Planning Committee hearing on 6 May 2025, the HIA reported shortages of trades, builders, building surveyors and engineers across regional Victoria, and witnesses urged offsite construction. Close to 25% of Victorians live in regional areas and 90% of regional dwellings are detached houses, according to that hearing. A finished module cuts the number of trade visits a detached house needs.

Gippsland is also part of the state’s own modular work. Build Australia reported in August 2026 that more than 350 modular social homes are planned by mid-2028 across Geelong, Ballarat, Bendigo, Ararat and Gippsland. Our page on Victoria’s 350 modular social homes covers that programme.

What EcoPrestige supplies

The structural steel frame is fabricated in an offsite factory and inspected there by the project engineer. The modules come with floors, walls, ceilings, linings, windows and the agreed services rough-in. For a home, design, permit documentation and construction are contracted by our sister company DST Project Management and Construction Pty Ltd, registered domestic builder CDB-U 72187, and EcoPrestige supplies the modules. You can read how that works in our Domestic Program for homeowners. For community and commercial buildings, a builder holds the head contract. The supply price is quoted for your site.

What does not fit

Hilly lots in the foothills north of Warragul can make a crane lift hard, so we check the slope, the road and the set-down point first. A tight lot in an older street may not have room to land a module. If you want an unusual roof or a house that wraps around a courtyard, a site build may suit you better. We will say so.

The approval path in Victoria

Homes are typically Class 1a, confirmed by your building surveyor. Structural design is by a PERA-registered structural engineer, an accredited NatHERS assessor does the energy rating, and a registered building surveyor issues the building permit. A small second dwelling up to 80 m2 usually needs no planning permit under VC253 as updated by VC306 (October 2026), but a building permit is always needed.

For commercial and community work: EcoPrestige coordinates the module design with your consultants; permit drawings are issued by the registered or licensed practitioner the state requires. Commercial building design is not a registered category in Victoria. Kindergartens are typically Class 9b and offices typically Class 5, confirmed by your building surveyor. Our guide to the building permit for modular buildings explains the inspections.

The programme

Once the permit is issued, the factory builds the modules while the Drouin or Warragul site gets its cut, footings and service trenches. Factory and site work run in parallel, so time on site is shorter. The modules are delivered, lifted, connected and inspected, and then the finishing work and the final inspection are done.

What to send us

  • 1. The address and a photo of the block from the street.
  • 2. Whether it is a main home, a second dwelling or a community building.
  • 3. Bedrooms or floor area.
  • 4. Any survey, soil report or drawings you hold.
  • 5. Slope, driveway width and overhead power lines.
  • 6. When you need it finished.

The Warragul and Baw Baw Shire page has more on commercial projects in the area.

Related: kit homes Traralgon

FAQ: modular construction in Baw Baw

Who builds my modular home in Drouin?
Our sister company DST Project Management and Construction Pty Ltd, registered domestic builder CDB-U 72187, contracts the design, permit documentation and construction. EcoPrestige supplies the modules.

What is Baw Baw Shire’s 2051 housing target?
The Plan for Victoria targets from the Department of Transport and Planning set Baw Baw at 25,700 net new homes by 2051.

Can modules get onto a hilly Warragul lot?
Often, but we check the slope, the road and where a crane can stand before we quote.

Do I still need a building permit?
Yes. A building permit is always needed. A small second dwelling up to 80 m2 usually needs no planning permit under VC253 as updated by VC306 (October 2026).

How much does it cost?
The supply price is quoted for your site once we know the plan, the access and the services.

Planning a home or building in Drouin or Warragul?

Send the site, the use and any drawings to prebuilt@ecoprestige.com.au or download our technical brochures.

Planning a commercial modular project?

Talk to our team about supply and early contractor involvement.