Tasmanian builders and business owners planning an office in Hobart, Launceston or the north west often ask whether an architect is required. Tasmania is different from most states. Building design is a licensed activity, so someone licensed must hold the design. That person does not have to be a registered architect. This page explains the Tasmanian rules and where modular supply fits.

The short answer for Tasmania

A building designer licence is needed for design work in Tasmania. A registered architect can hold the design, and many clients choose one for a landmark site. For a typical office, a licensed Tasmanian building designer is the usual choice.

Around that designer you need a structural engineer who is licensed, an energy assessment, a licensed building surveyor and a planner if the site needs a planning permit. Confirm with your building surveyor or certifier before you engage the team.

Why modular fits a Tasmanian office

Tasmania’s builders and surveyors already know modular work well. The Premier of Tasmania reported that ModHomes has delivered more than 280 homes, with 271 more in the pipeline. That experience carries across to commercial buildings: the inspection steps are familiar and the module logic is understood.

Office layouts repeat. Workrooms, meeting rooms and amenities line up on a module grid, and the factory can repeat each module type with the same detail. Weather on site matters less when most of the building is finished under cover. See our Hobart and Tasmania modular page for local context.

What EcoPrestige supplies

EcoPrestige supplies engineered structural steel volumetric modules, built and inspected in an offsite factory. For an office that covers the module structure, floors, walls, roofs, services rough-in and finishes to the agreed specification. Your builder holds the head contract and the site: footings, crane, connections and external works.

EcoPrestige does not offer design in Tasmania and never takes a Tasmanian design engagement. Permit drawings are issued by a licensed Tasmanian building designer, who holds the design. We supply the module engineering and the factory information that designer needs.

What does not fit

  • Offices with long column-free spans wider than a module.
  • Tight infill sites where a crane cannot reach the set-down point.
  • Briefs that are still moving after factory work begins.
  • Very small single-room offices, where a simple site-built job may be easier.

The approval path in Tasmania

Permit drawings are issued by a licensed Tasmanian building designer. Structural design is by a licensed engineer. A licensed building surveyor certifies the work. Offices are typically Class 5, confirmed by your building surveyor.

Planning approval under the planning scheme comes first where the site needs it, then the building permit. The surveyor will want the module engineering and the factory inspection records. Confirm with your building surveyor or certifier what they need and when. Our guide to building permits and inspections for modular buildings explains the usual steps.

The programme

Site works and footings run while the modules are built and inspected in the factory. Factory and site work run in parallel, so time on site is shorter. In Tasmania the sea crossing and weather windows need planning, so we fix dispatch and set dates with the builder early.

What to send us

  • 1. Site address and the title or survey.
  • 2. The office use, headcount and amenity needs.
  • 3. The name of your licensed Tasmanian building designer, if engaged.
  • 4. Any planning advice or permit conditions so far.
  • 5. Your target date for moving in.

Builders holding the head contract can read how our supply-only package for builders works, and our consultant brief shows what we hand to each discipline.

FAQ: architects and office buildings in TAS

Do I need an architect for an office in Tasmania?
Not always. Design must be held by a licensed person. A licensed Tasmanian building designer is the usual choice for a typical office. Confirm with your building surveyor or certifier.

Can EcoPrestige design my Tasmanian office?
No. EcoPrestige does not offer design in Tasmania. Permit drawings are issued by a licensed Tasmanian building designer, and we supply the module information they need.

Who certifies the building?
A licensed building surveyor certifies the work, with structural design by a licensed engineer.

What NCC class applies to an office?
Typically Class 5, confirmed by your building surveyor.

See also modular construction in Launceston.

Planning an office in Tasmania?

Send the site, the use and any drawings to prebuilt@ecoprestige.com.au or download our technical brochures.

Related: modular office buildings.

Looking to rebuild your coastal home?

Contact our team to bring your vision to life.