What modular worker accommodation suits Kalgoorlie and the Goldfields? Engineered steel modules can deliver staff houses, units and camp rooms built and checked in an offsite factory, then set on prepared footings by a local builder. Camp rooms are typically Class 1b or 3, confirmed by your building surveyor.
This page is for builders, mining contractors, government agencies, community housing providers and employers who need beds or homes in Kalgoorlie-Boulder, Kambalda, Coolgardie, Leonora, Laverton and Norseman. The problem is the same across the region: workers cannot find a place to live, and local trades are already committed. Every month without housing costs shifts, retention and service delivery.
Why modular fits the Goldfields
Demand is now backed by public money. The WA Government will prioritise 113 GROH homes for regional frontline workers in Kalgoorlie-Boulder, within a statewide program of more than 500 GROH homes over five years. Rio Tinto ($100m), BHP ($50m) and Hancock ($20m) are contributing through the Resources Community Investment Initiative, and the 2026-27 State Budget includes $419m for GROH and other government worker accommodation (WA Government, 28 April 2026).
That volume needs repeatable product. A module that is built, inspected and signed off in the factory arrives on site complete. The site crew handles footings, services and connections. Heat, dust and distance then affect a short site phase rather than a full build.
What EcoPrestige supplies
As the manufacturer, EcoPrestige is responsible for every module: built and inspected in an offsite factory to Australian engineering and QA, then delivered to site. We supply to the builder who holds the head contract, or to the owner who appoints one.
- Staff houses and duplex units for GROH-style housing, typically Class 1a, confirmed by your building surveyor.
- Camp room blocks with ensuites, typically Class 1b or 3, confirmed by your building surveyor.
- Amenity, laundry and kitchen modules for villages.
- Offices and crib rooms; see our page on modular site offices.
- A documentation pack and bill of quantities so the builder can price site works.
Each job gets a supply price quoted for your site. Builders taking the head contract should read our supply-only guide for builders.
What does not fit
- Infill lots in older parts of Boulder with no crane or truck access to the set-down point.
- Heritage-listed streetscapes where the City of Kalgoorlie-Boulder requires a form a module cannot match.
- Sites with major cut and fill, or reactive clay needing footings that have not yet been engineered.
- Very small orders that cannot justify a crane day on their own.
- Projects that need a builder from us: EcoPrestige is not the builder.
The approval path in WA
EcoPrestige coordinates the module design with your consultants; permit drawings are issued by the registered or licensed practitioner the state requires. In WA, a registered building surveying contractor signs the certificate of design compliance and the local government issues the building permit. Building design is not a registered category, and building engineers must be registered from 1 July 2027.
Planning approval depends on the zone. A workforce village on rural or industrial land usually needs development approval from the City of Kalgoorlie-Boulder or the relevant shire. Confirm every signatory with your building surveyor or certifier. Our consultant brief lists what the engineer, surveyor and planner receive from us.
The programme
The programme runs factory and site work in parallel, so time on site is shorter. While the modules are built and inspected, the builder clears the pad, sets the footings and runs power, water and sewer. Modules arrive by truck in planned loads, a crane sets them, and the builder makes the connections, decks and walkways. The building surveyor inspects and the occupancy permit follows. For the bigger picture on mining housing, see modular workforce accommodation in WA and our Pilbara village supply notes.
What to send us
- 1. The site address, zone and any planning advice from the council.
- 2. The use: GROH houses, camp rooms or mixed.
- 3. Number of homes or rooms, and the bedroom mix.
- 4. Services at the boundary: power, water, sewer or a treatment plant.
- 5. Access photos and the crane set-down area.
- 6. Who holds the head contract, and your target occupation date.
Councils and agencies buying for regional towns can also read our regional councils procurement guide.
Related: modular workforce accommodation WA
Goldfields worker accommodation: FAQ
What NCC class is worker accommodation in Kalgoorlie?
Camp rooms are typically Class 1b or 3, confirmed by your building surveyor. Staff houses are typically Class 1a, confirmed by your building surveyor.
How many GROH homes are planned for Kalgoorlie-Boulder?
The WA Government will prioritise 113 GROH homes for regional frontline workers in Kalgoorlie-Boulder, within a statewide program of more than 500 GROH homes over five years (WA Government, 28 April 2026).
Who builds modular accommodation on a Goldfields site?
A builder holds the head contract and the site. EcoPrestige manufactures and delivers the modules and gives the builder a documentation pack and bill of quantities.
Send us your Goldfields accommodation brief
Send the site, the use and any drawings to prebuilt@ecoprestige.com.au or download our technical brochures.