How Do You Compare Modular Supplier Quotes? (2026)

To compare modular supplier quotes, line them up against the same scope first, then check what each one includes, what documentation pack comes with the modules, who carries freight and installation, and what programme is offered. Two quotes with the same bottom line can cover very different work. The cheapest looking number is often the one with the most left out.

This page is for builders, developers, councils and operators across Australia holding two or more modular quotes that do not look alike. One supplier quotes delivered to site, another quotes at the factory gate, a third quotes installed. Without a common basis, you are not comparing like with like, and the gap shows up later as a variation.

Why modular quotes are hard to compare

A site-built quote usually follows a familiar trade breakdown. Modular quotes do not. Each supplier draws the line between the factory, the road and the site in a different place. Some include finishes and appliances, others leave them to the builder. Some include engineering for the module, others assume your engineer does it.

The five things to line up

Scope

Start with a written scope that every supplier quotes against: the building use, the number and size of modules, the specification level, and the drawings revision. If one supplier quoted an older drawing, ask them to requote.

Inclusions and exclusions

Make a table with every item down the side and every supplier across the top. Mark each item included, excluded or provisional. Look hard at structural engineering for the modules, wet area fit-out, joinery, floor finishes, electrical fit-off and fire separation. Site works, footings, the crane and permits are the usual exclusions, so check each quote states them.

Documentation pack

Ask each supplier what records come with the modules: structural drawings and calculations, the inspection and test plan, signed hold point records, test results and material certificates. A quote without a documentation pack can leave your building surveyor without the evidence they need.

Freight and installation split

Check where each quote stops. Factory gate, delivered to site, or set on footings. Then check who pays for the crane, the escort vehicles, permits for oversize loads, and the crew that connects the modules. The installation and crane guide explains what each of these involves.

Programme

Ask for a programme with the same stages from each supplier: design sign-off, factory start, factory finish, delivery and installation. A programme that has no date for design sign-off usually means the clock has not really started.

What EcoPrestige supplies

EcoPrestige supplies engineered structural steel volumetric modules, built and inspected in an offsite factory, with a supply price quoted for your site. Our quotes set out what is included and excluded, what documentation comes with the modules, and where the supply scope stops so your builder can price the rest. Builders using our early contractor involvement can read the ECI service page.

What a comparison cannot fix

A side-by-side table will not tell you whether a supplier delivers. Check registration and insurance where they apply, ask for references or a prior job, and read the scope documents properly before you choose. If two suppliers use different structural systems, compare the engineering basis as well, not only the price.

The approval path

Whatever quote you choose, the building still needs a permit or approval for its class. EcoPrestige coordinates the module design with your consultants; permit drawings are issued by the registered or licensed practitioner the state requires. In Queensland, permit drawings are issued under a QBCC licensed building designer. In Tasmania, they are issued by a licensed Tasmanian building designer. Before you sign, check that each supplier’s documentation pack matches your building surveyor’s checklist.

The programme

Once a supplier is chosen, the factory builds while the builder prepares the site. Factory and site work run in parallel, so time on site is shorter. A late choice of supplier delays that start, so allow time for the comparison in your own programme.

What to send us

  • 1. The scope you are asking every supplier to quote against.
  • 2. The drawings and their revision.
  • 3. The site address and access constraints.
  • 4. Whether you want factory gate, delivered or installed pricing.
  • 5. Your building surveyor’s checklist, if you have it.

For a wider checklist on choosing a supplier, see how to evaluate a modular construction supplier.

Comparing modular quotes: common questions

What should a modular supplier quote include?
It should state the scope and drawing revision, list inclusions and exclusions, name the documentation pack supplied with the modules, say where the supply stops, and give a programme by stage.

Why are two modular quotes so different?
Usually because they cover different scope. One may stop at the factory gate and another may include delivery, crane and installation. Line them up against the same scope before comparing.

Should freight and installation be priced separately?
It helps. A separate line for freight and installation shows where the supply stops and lets your builder see what is left to price.

What documents should come with the modules?
Structural drawings and calculations, the inspection and test plan, signed hold point records, test results and material certificates, so your building surveyor has the evidence they need.

How do I check a modular supplier before choosing?
Check registration and insurance where they apply, ask for references or a prior job, and read every scope and quotation document in full.

Want a quote laid out so it can be compared?

Send the site, the use and any drawings to prebuilt@ecoprestige.com.au or download our technical brochures.

Related: modular construction companies.

Planning a commercial modular project?

Talk to our team about supply and early contractor involvement.