Short answer: ECI Stage 2 issues one coordinated set of module drawings and a brief for each of your consultants. The fee depends on supply value: $10,000 under $1 million, $20,000 from $1 million to $3 million, $30,000 from $3 million to $4 million, and $40,000 over $4 million, all plus GST.
What is the Stage 2 fee?
| Supply value | Stage 2 fee (plus GST) |
|---|---|
| Under $1 million | $10,000 |
| $1 million to $3 million | $20,000 |
| $3 million to $4 million | $30,000 |
| Over $4 million | $40,000 |
The fee is separate from module supply and does not reduce the supply price.
What is in a typical Stage 2 issue?
Cover and general notes, a site plan with the module footprint, a floor plan on the module grid, module set-out and join types, roof plan, elevations, two building sections with levels, typical details, bearing points and preliminary loads, services connection points, and a finishes and inclusions schedule.
Who gets a brief?
Each of your consultants receives a brief and transmittal sized to where the project sits: before or during planning, with a planning permit already issued, or at building documentation stage.
How many revisions are included?
One coordinated issue, two rounds of revisions to the modular design and one round for the building surveyor.
What do I pay for separately?
Your consultants’ own review and certification fees, surveys, soil tests and reports, council and authority fees, and site-specific design beyond the modular scope.
Does Stage 2 need Stage 1 first?
Yes. Stage 1 confirms scope and price, then Stage 2 documents it. Documentation stays marked indicative until Stage 1 is complete.
Related guides
- Early Contractor Involvement for modular projects: stages and fees
- ECI Stage 1: feasibility and firm supply price
- ECI questions answered
Frequently asked questions
What does ECI Stage 2 cost?
$10,000 under $1 million of supply, $20,000 from $1 million to $3 million, $30,000 from $3 million to $4 million, $40,000 over $4 million. All plus GST.
What do I get from Stage 2?
One coordinated set of module drawings plus a brief and transmittal for each of your consultants.
How many revision rounds are included?
Two rounds of revisions to the modular design and one round for the building surveyor.
Do I need Stage 1 before Stage 2?
Yes. Stage 1 confirms scope and price first.
*Fees are plus GST on a commercial basis. ECI fees are charged separately and do not reduce the supply price. Design and building work is carried out by the licensed or registered practitioner your state requires.