Yes. Structural steel volumetric modules can be stacked two or three storeys high, provided the structural engineer designs the frames, the stacking connections and the stability system for the full height. Above one storey the building must also meet the NCC fire, egress and access requirements for its class, which usually adds stairs, often a lift, and fire-rated separation between modules.
This page is for developers, community housing providers, builders, councils and operators across Australia with a site that needs more floor area than one storey can give. The problem is that many people picture modular as single-storey boxes. Stacking works well, but it changes the engineering, the fire design, the crane and the order of work, and those choices have to be made at the start, not after the drawings are done.
Why steel modules stack well
A structural steel module has a frame of columns and beams at its corners and edges. When modules are stacked, the loads run down through those columns to the footings. The engineer checks each column for the weight above it, and designs bracing or a separate core to keep the stack stable under wind and, where it applies, earthquake loads. Lighter frames can stack too, but steel gives more height and longer spans for the same wall thickness. Our frame system comparison explains the trade-offs.
We have written up real stacking work, such as multi-storey modular stacking at Newstead.
What changes above one storey
Fire
Multi-storey apartments, typically Class 2, and motels and student housing, typically Class 3, each confirmed by your building surveyor, need fire-rated floors and walls between units. In a modular building the floor of one module and the ceiling of the one below together form that separation. The joins between modules must keep the rating. See our guide to fire-rated modular buildings.
Stairs, lifts and access
Upper floors need compliant stairs and, depending on the class, accessible paths and a lift. These are often built as separate structures beside the modules.
Acoustics and services
Stacked modules have a gap between the floor of one and the ceiling of the next, which helps sound separation. Plumbing stacks must line up through every level, which needs early coordination with the hydraulic engineer.
Crane and site
The top modules set the crane size and the crane pad. A tight site may limit the height you can reach.
What EcoPrestige supplies
EcoPrestige supplies engineered structural steel volumetric modules, built and inspected in an offsite factory, for buildings of one to three storeys and more where the engineering allows. We coordinate the module design with the project engineer so column loads, stacking connections and fire-rated floor and ceiling build-ups suit the full stack.
What does not fit
Tall towers are usually better built with a site-built or precast structure and factory parts. BDO reported that the build-to-rent pipeline is mostly high-rise, so modular fits there as components and bathroom pods, not whole buildings (BDO, 2026). Very deep plans, large open floors and heavy roof plant also suit other methods.
The approval path
A stacked modular building needs the same planning and building approvals as a site-built building of the same class and height. In New South Wales, Class 2, 3 and 9c buildings need a registered design practitioner and registered engineer until the Building (Approvals and Practitioners) Act 2026 commences; our page on NSW registered design practitioners explains this. EcoPrestige coordinates the module design with your consultants; permit drawings are issued by the registered or licensed practitioner the state requires. In Queensland, permit drawings are issued under a QBCC licensed building designer, and in Tasmania by a licensed Tasmanian building designer. Confirm with your building surveyor or certifier.
The programme
The factory builds every level of modules while the builder pours the footings and builds any stair or lift core. Factory and site work run in parallel, so time on site is shorter. The modules are then set level by level, joined and connected. Medium-density designs are a current focus in NSW: the MMC Innovation Facility is a state-backed factory that will start with medium-density designs from the NSW Government Pattern Book (Prefab News, 21 June 2026).
What to send us
- 1. The site address and the zone.
- 2. The number of storeys and units you want.
- 3. The use: apartments, motel, student rooms, offices or other.
- 4. Any planning drawings or a yield study.
- 5. Access for trucks and a crane.
Multi-storey modular: questions buyers ask
Can modular buildings be two or three storeys?
Yes. Structural steel modules can be stacked two or three storeys high when the engineer designs the frames, stacking connections and stability system for the full height.
What changes when a modular building goes above one storey?
The building must meet the NCC fire, egress and access requirements for its class. That usually means fire-rated floors and walls between units, compliant stairs and often a lift.
Are multi-storey modular buildings fire rated?
They must be where the class requires it. The floor of one module and the ceiling of the one below together form the fire-rated separation, and the joins must keep the rating.
Is modular suitable for high-rise towers?
Usually not as whole modules. BDO reported that the build-to-rent pipeline is mostly high-rise, so modular fits there as components and bathroom pods, not whole buildings (BDO, 2026).
Who signs off a multi-storey modular building?
The structural engineer designs the structure and the building surveyor or certifier certifies the building. Who must be registered depends on the state and the class.
Related: our guide to modular construction in Canberra.
Related: our guide to modular building installation.
Planning a two or three storey modular building?
Send the site, the use and any drawings to prebuilt@ecoprestige.com.au or download our technical brochures.