BASIX applies to a modular home in NSW exactly as it does to any new home. You need a BASIX certificate for the development application or complying development certificate, and the energy, water and thermal commitments it lists must be shown on the plans and built. With modular, those commitments have to be settled before the modules are made, because walls, insulation and glazing are closed in at the factory.
This page is for NSW homeowners, small builders and community housing providers planning modular homes, granny flats or small infill projects from Sydney to the regions. The problem we see is BASIX treated as a late form, when on a modular home it decides the wall, roof, floor and window build-up before production starts.
What BASIX covers
BASIX, the Building Sustainability Index, sets energy, water and thermal performance commitments for new homes in NSW. The certificate lists items such as insulation, glazing, hot water, lighting, fixtures and any rainwater tank. The certifier checks that the plans show them and that the home is built to them before occupation.
Why BASIX matters more on a modular home
On a site-built home, a missed insulation detail can sometimes be fixed before the linings go on. On a modular home, the linings are installed in the factory. So the thermal assessment must use the real module build-ups, and the BASIX commitments must match the factory specification. We keep inspection records and photos of insulation and glazing so the certifier has the evidence.
What EcoPrestige supplies
EcoPrestige supplies engineered structural steel modules for homes, typically Class 1a, confirmed by your building surveyor. We give your energy assessor the module wall, floor and roof build-ups and window schedule so the BASIX certificate reflects what is built. The supply price is quoted for your site.
What does not fit
If a site’s BASIX result depends on a heavy masonry thermal mass design, a light steel module may need a different strategy, such as more insulation or better glazing. Very narrow or steep lots with no crane access may also suit another build method.
The approval path in NSW
EcoPrestige coordinates the module design with your consultants; permit drawings are issued by the registered or licensed practitioner the state requires. In NSW, Class 1 homes have no designer registration under the Design and Building Practitioners Act. A registered certifier certifies, and BASIX is required for homes. Confirm with your building surveyor or certifier.
The Building (Approvals and Practitioners) Act 2026 passed Parliament on 4 Aug 2026 and received assent on 14 Aug 2026. It brings prefabricated buildings into the approvals system, with detail to come by regulation. See our page on the NSW prefabricated building law.
The programme
The BASIX certificate and energy assessment are done with the design, before production. Then the modules are made in the factory while footings and services are built on site. Factory and site run in parallel, so time on site is shorter. The NSW Government reported that three modular homes at Shellharbour went from approval to completion in 14 to 16 weeks.
Common BASIX mistakes on modular homes
- Running the thermal assessment on generic wall types instead of the actual module build-ups.
- Changing windows or glazing after the certificate is issued, without updating it.
- Leaving the hot water and solar choice until the modules are already in production.
- Forgetting that a second dwelling on the same lot also needs its own BASIX commitments.
Each of these can mean a revised certificate, a revised plan set, or rework in the factory. Settle them once, at design stage.
Related reading
See our pages on modular construction in Sydney, modular social housing in NSW and transportable buildings in NSW.
What to send us
- 1. The lot address and planning pathway, DA or CDC, if known.
- 2. Your plan or sketch, with orientation.
- 3. Any BASIX certificate or energy report already done.
- 4. Hot water, solar and rainwater preferences.
- 5. Your certifier’s details, if appointed.
BASIX and modular homes: FAQ
Does a modular home need BASIX in NSW?
Yes. A new modular home needs a BASIX certificate like any other new home in NSW.
When should BASIX be done for a modular home?
Before the modules are made, because insulation, linings and glazing are closed in at the factory.
How does the certifier check BASIX items on a modular home?
By checking the plans against the certificate and reviewing factory inspection records and photos before occupation.
Who certifies a modular home in NSW?
A registered certifier. Confirm the pathway with your certifier.
Planning a modular home in NSW?
Send the site, the use and any drawings to prebuilt@ecoprestige.com.au or download our technical brochures.