Modules are joined on site with bolted structural steel connections between their frames, at the corners and along the mating floors, walls and roofs, designed and signed off by the project’s structural engineer. The joins are then weatherproofed with flashings, membranes, sealants and cover strips. Finally, the services in each module are linked across the joins through plumbing, electrical and data connection points the factory leaves ready.
This page is for builders, site managers, building surveyors and developers in Australia taking delivery of a modular building for the first time. The problem is that the joins are where a modular building is won or lost. Most of the building is finished and inspected in the factory, but the joins are made on site, by the builder’s crew, often in a tight window between crane lifts and the next weather front.
The structural connections
Module to footings
Each module is set on footings, piles or stumps and fixed with bolted brackets or cast-in plates. These hold-downs resist wind uplift and sliding as well as carrying the weight. The engineer sets the tie-down design for the site’s wind region and soil. Our page on footings and tie-downs covers the footing side.
Module to module, side by side
Modules placed next to each other are bolted together through plates on their edge beams or columns. This ties the row together so it acts as one building under wind loads.
Module to module, stacked
Stacked modules connect at the corner columns, usually with locating pins and bolted plates, so the upper module sits true and the loads run straight down. Bracing or a separate core keeps the stack stable.
Weatherproofing the joins
- Roof joins are covered with capping or a continuous membrane laid after the modules are set.
- Wall joins are closed with flashings and sealed cover strips that match the cladding.
- Floor joins at the perimeter get a skirting, termite and vermin barrier where required.
- Modules arrive wrapped, and the builder keeps open joins covered until they are sealed.
Fire-rated and acoustic walls carry on through the joins with fire-rated sealants, packers and linings so the separation is unbroken. Our page on fire-rated modular buildings explains the ratings.
Linking the services
Each module is plumbed, wired and ducted in the factory to set connection points at the join. On site, licensed plumbers and electricians link water, waste, power, data and fire services across the joins and to the site mains. Waste pipes need the right fall across the join, so the module levels must be set accurately. Our page on building services connections in modular construction covers each service in detail.
What EcoPrestige supplies
EcoPrestige supplies engineered structural steel volumetric modules, built and inspected in an offsite factory, with connection plates, lifting points and service connection points built in. With the modules we supply a join and connection schedule for the builder and the engineer: bolts and plates at each join, the flashing and sealant details, and where each service crosses. The builder makes the joins on site.
What does not fit
Joins are not a place to improvise. Cutting, welding or drilling a module frame on site without the engineer’s approval can void the structural design. Sites where a crane cannot set the modules accurately, or where weather cannot be managed during setting, need more planning before delivery.
Who inspects and certifies the joins
The structural engineer specifies and signs off the connections. The building surveyor or certifier inspects at the stages the permit sets and certifies the building. In New South Wales, the Building (Approvals and Practitioners) Act 2026 brings the installation of prefabricated buildings into the approvals system, with prefabricated building instructions to be detailed by regulation (MBA NSW, 31 August 2026). EcoPrestige coordinates the module design with your consultants; permit drawings are issued by the registered or licensed practitioner the state requires.
The programme
The factory builds the modules while the builder prepares footings and services. Factory and site work run in parallel, so time on site is shorter. Setting, joining and weatherproofing then follow the crane in a planned sequence. See our installation and crane guide.
What to send us
- 1. The site address and the crane access.
- 2. The number of modules and storeys.
- 3. Your engineer’s details, or ask us to coordinate with one.
- 4. The site services available at the boundary.
- 5. Your planned set-out and setting dates.
Joining modules on site: questions buyers ask
How are modules joined together on site?
Modules are bolted together through steel plates on their frames, at the corners and along the mating edges, to a design signed off by the structural engineer. Stacked modules connect at the corner columns.
How are the joins between modules weatherproofed?
Roof joins are capped or covered with a membrane, wall joins are closed with flashings and sealed cover strips, and the modules stay wrapped until the joins are sealed.
How are services connected between modules?
Each module is plumbed and wired in the factory to set connection points. On site, licensed plumbers and electricians link the services across the joins and to the site mains.
Who certifies the joins in a modular building?
The structural engineer specifies and signs off the connections, and the building surveyor or certifier inspects and certifies the building.
Can a builder modify a module frame on site?
Not without the engineer’s approval. Cutting, welding or drilling a module frame can affect the structural design.
More detail: modular construction in Canberra.
Want the join details for your modular project?
Send the site, the use and any drawings to prebuilt@ecoprestige.com.au or download our technical brochures.