As at 29 October 2026, Western Australian builders in the regions have a clear housing pipeline to plan for, and a delivery question nobody has fully answered. ABC News reported on 28 April 2026 that the WA Government will build more than 500 homes for regional public servants through Government Regional Officer Housing, known as GROH, over five years. The program is worth $419m and is part-funded by major miners. The problem is capacity. Regional towns already short of trades now need teacher, nurse and police homes on top of private work.
Where the homes are going
ABC News reported that 305 of the homes are planned for Karratha and Port Hedland, and 37 for Geraldton. Kalgoorlie, Broome and Albany are also on the list. That spread matters. The Pilbara share is the largest by far, and it sits in towns where the Pilbara Development Commission counted 80,432 workforce accommodation beds in December 2025, with many villages at capacity. Builders competing for trades, beds and crane time in the same towns will feel the squeeze first.
The delivery question Master Builders WA raised
Master Builders WA asked how the program will be delivered and said modular should be considered for worker camps. That is a fair point for builders to take into tender planning. If the homes are delivered one lot at a time with site trades doing everything, the same small crews will be stretched across GROH, mining and private work. A factory route moves frame, wet areas and linings off the lot, so the local crew can focus on footings, services, connections and handover.
Our existing page on modular GROH worker housing in regional WA covers the house types and lot layouts. This article looks at the program as news and what it asks of builders now.
What EcoPrestige supplies
- Engineered structural steel volumetric modules for detached and grouped homes, built and inspected in an offsite factory.
- Module engineering inputs for the project structural engineer.
- A documentation pack for the registered building surveying contractor.
- A delivery and lift sequence planned around each town’s access and wind conditions.
EcoPrestige is not the builder. The builder holds the head contract, the site and the handover to the department. See our page on supply-only modules for builders for how that split works. For larger village and camp work in the same towns, see our page on modular workforce accommodation in WA.
What does not fit
Not every GROH lot suits a module. Infill lots behind existing houses with no crane access are hard. Lots needing long road moves on narrow tracks may cost more in transport than they save. Where the department wants a one-off design on a single lot, a site build may be simpler. We say so early rather than after a factory slot is booked.
The approval path in WA
EcoPrestige coordinates the module design with your consultants; permit drawings are issued by the registered or licensed practitioner the state requires. In WA, building surveying is done by a registered building surveying contractor. Building design is not a registered category. Building engineers must be registered from 1 July 2027. A detached GROH home is typically Class 1a, confirmed by your building surveyor. Always confirm the full set of signatories with your building surveyor or certifier.
The programme
Modules for a batch of homes are built in the factory while footings, slabs and services are done on each lot. Factory and site work run in parallel, so time on site is shorter. For the Pilbara, that means fewer weeks of trades needing beds in towns where beds are already scarce.
What to send us
- 1. The towns and lot addresses, or the tender package if released.
- 2. The house types and number of bedrooms required.
- 3. Any department design standards issued with the tender.
- 4. Site surveys, soil reports and wind region, if known.
- 5. Your target handover dates.
GROH regional housing: questions
How many GROH homes is WA planning?
ABC News reported on 28 April 2026 that the WA Government will build more than 500 homes for regional public servants over five years, a $419m program part-funded by major miners.
Which towns get the most GROH homes?
ABC News reported 305 homes for Karratha and Port Hedland and 37 for Geraldton, with Kalgoorlie, Broome and Albany also included.
Is EcoPrestige the builder on a GROH project?
No. EcoPrestige supplies structural steel volumetric modules. The builder holds the head contract, the site works and the handover.
Who certifies a modular GROH home in WA?
A registered building surveying contractor. A detached home is typically Class 1a, confirmed by your building surveyor.
How is pricing given?
Supply price quoted for your site, once we have the lots, the house types and the access details.
Tendering for GROH homes in regional WA?
Send the site, the use and any drawings to prebuilt@ecoprestige.com.au or download our technical brochures.